Killeen · issues
Civic issues
Topics getting the most attention in Killeen public meetings, ranked by how frequently they come up.
Street Construction Materials Contract
The city was set to lock in its annual street construction materials suppliers for the year, a $1 million citywide award that keeps paving and repair work supplied.
Zephyr Road Reconstruction Design
An $80,591 amendment finalizes the Featherline design with bigger culverts, sidewalks on both sides and a signal at Malmstrom, tying into a broader water-loop project in the area.
Thoroughfare Plan Reclassification
The city updated its transportation plan to reclassify a local road connection, saving on costly floodplain bridging while maintaining proper circulation.